Construction updateConstruction Updates

August 14-24, 2014

 

Thursday (8/14)

  • A lane will be closed during the day 84th St entrance ramp to I-94 WB for a concrete pour.
  • A lane will be closed during the day I-94 EB exit ramp to 84th St for a concrete pour.
  • The left left-turn lane will be closed during the day Greenfield Ave EB at the I-894/US 45 NB ramps for ATC utility work.
  • The left left-turn lane will be closed during the day Greenfield Ave WB at the I-894/US 45 NB ramps for ATC utility work.
  • The left left-turn lane will be closed during the day I-894/US 45 NB exit ramp to Greenfield Ave for ATC utility work.
  • A lane will be closed during the day 92nd St NB/SB at Adler St for utility work.
  • A lane will be closed long term by 6am through 9/5 Kearney St EB from I-94 entrance ramp to 76th St for box culvert construction (this closure will be lifted Friday afternoon through Sunday night for Indyfest).
  • A lane will be closed overnight I-94 WB west of 84th St for soil boring.
  • Lanes will be closed overnight US 45 SB from Wisconsin Ave to Lincoln Ave for pavement marking.
  • The Zoo Int N-E system ramp will be closed overnight for pavement marking.
  • The Zoo Int E-S system ramp will be closed overnight for pavement marking.
  • There will be a 15 minute rolling full closure from 3am to 4am I-94 WB from 68th St to 70th St for pavement marking.

Friday (8/15)

  • A lane will be closed during the day 84th St entrance ramp to I-94 WB for a concrete pour.
  • A lane will be closed during the day I-94 EB exit ramp to 84th St for a concrete pour.
  • The left left-turn lane will be closed during the day Greenfield Ave EB at the I-894/US 45 NB ramps for ATC utility work.
  • The left left-turn lane will be closed during the day Greenfield Ave WB at the I-894/US 45 NB ramps for ATC utility work.
  • The left left-turn lane will be closed during the day I-894/US 45 NB exit ramp to Greenfield Ave for ATC utility work.
  • A lane will be closed during the day 92nd St NB/SB at Adler St for utility work.
  • Lanes will be closed overnight I-94 EB/WB at 76th St for form mobilization. *contingency is Saturday 8/16
  • There will be a 15 minute rolling full closure from 2am to 4am I-94 EB/WB at 76th St for form mobilization. *contingency is Saturday 8/16

Saturday (8/16)

  • A lane will be closed in the morning 84th St entrance ramp to I-94 WB for a concrete pour.
  • The left left-turn lane will be closed during the day Greenfield Ave EB at the I-894/US 45 NB ramps for ATC utility work.
  • The left left-turn lane will be closed during the day Greenfield Ave WB at the I-894/US 45 NB ramps for ATC utility work.
  • The left left-turn lane will be closed during the day I-894/US 45 NB exit ramp to Greenfield Ave for ATC utility work.

Sunday (8/17)

  • The left left-turn lane will be closed during the day Greenfield Ave EB at the I-894/US 45 NB ramps for ATC utility work.
  • The left left-turn lane will be closed during the day Greenfield Ave WB at the I-894/US 45 NB ramps for ATC utility work.
  • The left left-turn lane will be closed during the day I-894/US 45 NB exit ramp to Greenfield Ave for ATC utility work.
  • A lane will be closed 9pm through 8/20 HWY 100 NB/SB from National Ave to north of Cleveland Ave for utility work.
  • The left turn lane will be closed overnight HWY 100 NB/SB to Cleveland Ave for utility work.

Monday (8/18)

  • A lane will be closed 8/17 through 8/20 HWY 100 NB/SB from National Ave to north of Cleveland Ave for utility work.
  • A lane will be closed during the day 84th St entrance ramp to I-94 WB for a concrete pour.
  • A lane will be closed during the day I-94 EB exit ramp to 84th St for a concrete pour. *contingency is Tuesday 8/13 and Wednesday 8/14
  • The left left-turn lane will be closed during the day Greenfield Ave EB at the I-894/US 45 NB ramps for ATC utility work.
  • The left left-turn lane will be closed during the day Greenfield Ave WB at the I-894/US 45 NB ramps for ATC utility work.
  • The left left-turn lane will be closed during the day I-894/US 45 NB exit ramp to Greenfield Ave for ATC utility work.
  • A lane will be closed during the day 92nd St NB/SB at Adler St for utility work.
  • The left left-turn lane will be closed during the day Bluemound Rd WB at HWY 100 for signal work.
  • The right left-turn lane will be closed during the day HWY 100 NB at Bluemound Rd for signal work.
  • The left turn lane will be closed overnight HWY 100 NB/SB to Cleveland Ave for utility work.
  • A lane will be closed overnight I-94 WB from 84th St to the Zoo Interchange for pavement marking.
  • The Zoo Int E-N system ramp will be closed overnight for pavement marking.
  • The Zoo Int N-W system ramp will be closed overnight for pavement marking.
  • There will be a full closure overnight US 45 NB at Wisconsin Ave for girder setting. *contingency is Wednesday 8/20
  • There will be a full closure overnight US 45 SB at North Ave for girder setting. *contingency is Wednesday 8/20
  • The Zoo Int W-N system ramp will be closed overnight for girder setting. *contingency is Wednesday 8/20
  • There will be a full closure overnight I-94 EB at Moorland Rd for girder setting.

Tuesday (8/19)

  • A lane will be closed 8/17 through 8/20 HWY 100 NB/SB from National Ave to north of Cleveland Ave for utility work.
  • A lane will be closed during the day 84th St entrance ramp to I-94 WB for a concrete pour.
  • The left left-turn lane will be closed during the day Greenfield Ave EB at the I-894/US 45 NB ramps for ATC utility work.
  • The left left-turn lane will be closed during the day Greenfield Ave WB at the I-894/US 45 NB ramps for ATC utility work.
  • The left left-turn lane will be closed during the day I-894/US 45 NB exit ramp to Greenfield Ave for ATC utility work.
  • A lane will be closed during the day 92nd St NB/SB at Adler St for utility work.
  • A lane will be closed during the day Bluemound Rd WB at 84th St for fiber optic splicing. *contingency is Thursday 8/21
  • The left turn lane will be closed overnight HWY 100 NB/SB to Cleveland Ave for utility work.
  • Lanes will be closed overnight US 45 NB/SB from Wisconsin Ave to North Ave for girder splicing.
  • A lane will be closed overnight US 45 SB from Wisconsin Ave to Greenfield Ave for pavement marking.
  • A lane will be closed overnight I-94 WB from 84th St to the Zoo Interchange for pavement marking.
  • The Zoo Int W-S system ramp will be closed overnight for pavement marking.
  • The Zoo Int N-W system ramp will be closed overnight for pavement marking.
  • The Zoo Int W-N system ramp will be closed overnight for pavement marking.
  • The Zoo Int E-S system ramp will be closed overnight for pavement marking.
  • There will be a full closure overnight I-94 EB at Moorland Rd for girder setting.
  • The Zoo Int S-W system ramp will be closed overnight for barrier wall removal and steel erection.

Wednesday (8/20)

  • A lane will be closed 8/17 through 3pm HWY 100 NB/SB from National Ave to north of Cleveland Ave for utility work.
  • A lane will be closed during the day 84th St entrance ramp to I-94 WB for a concrete pour.
  • The left left-turn lane will be closed during the day Greenfield Ave EB at the I-894/US 45 NB ramps for ATC utility work.
  • The left left-turn lane will be closed during the day Greenfield Ave WB at the I-894/US 45 NB ramps for ATC utility work.
  • The left left-turn lane will be closed during the day I-894/US 45 NB exit ramp to Greenfield Ave for ATC utility work.
  • A lane will be closed during the day 92nd St NB/SB at Adler St for utility work.
  • The left turn lane will be closed overnight HWY 100 NB/SB to Cleveland Ave for utility work.
  • A lane will be closed overnight I-894/US 45 NB from Greenfield Ave to Schlinger Ave for pavement marking.
  • A lane will be closed overnight US 45 SB from Wisconsin Ave to Greenfield Ave for pavement marking.
  • The Zoo Int W-S system ramp will be closed overnight for pavement marking.
  • The Zoo Int N-W system ramp will be closed overnight for pavement marking and girder setting.
  • There will be a full closure overnight I-94 EB at Moorland Rd for girder setting. *contingency is Saturday 8/23
  • There will be a full closure overnight I-94 WB at Zoo Int for girder setting. *contingency is Saturday 8/23
  • The Zoo Int S-W system ramp will be closed overnight for girder setting. *contingency is Saturday 8/23

Thursday (8/21)

  • A lane will be closed during the day 84th St entrance ramp to I-94 WB for a concrete pour.
  • The left left-turn lane will be closed during the day Greenfield Ave EB at the I-894/US 45 NB ramps for ATC utility work.
  • The left left-turn lane will be closed during the day Greenfield Ave WB at the I-894/US 45 NB ramps for ATC utility work.
  • The left left-turn lane will be closed during the day I-894/US 45 NB exit ramp to Greenfield Ave for ATC utility work.
  • A lane will be closed during the day 92nd St NB/SB at Adler St for utility work.
  • There will be a full closure overnight I-94 EB at Moorland Rd for girder setting. *contingency is Saturday 8/23
  • There will be a full closure overnight I-94 WB at Zoo Int for girder setting. *contingency is Saturday 8/23
  • The Zoo Int N-W system ramp will be closed overnight for girder setting. *contingency is Saturday 8/23
  • The Zoo Int S-W system ramp will be closed overnight for girder setting. *contingency is Saturday 8/23

Friday (8/22)

  • A lane will be closed during the day 84th St entrance ramp to I-94 WB for a concrete pour.
  • The left left-turn lane will be closed during the day Greenfield Ave EB at the I-894/US 45 NB ramps for ATC utility work.
  • The left left-turn lane will be closed during the day Greenfield Ave WB at the I-894/US 45 NB ramps for ATC utility work.
  • The left left-turn lane will be closed during the day I-894/US 45 NB exit ramp to Greenfield Ave for ATC utility work.
  • A lane will be closed during the day 92nd St NB/SB at Adler St for utility work.
  • There will be a full closure overnight I-94 EB at Moorland Rd for girder setting. *contingency is Saturday 8/23
  • There will be a full closure overnight I-94 WB at Zoo Int for girder setting. *contingency is Saturday 8/23
  • The Zoo Int N-W system ramp will be closed overnight for girder setting. *contingency is Saturday 8/23
  • The Zoo Int S-W system ramp will be closed overnight for girder setting. *contingency is Saturday 8/23

Saturday (8/23)

  • The left left-turn lane will be closed during the day Greenfield Ave EB at the I-894/US 45 NB ramps for ATC utility work.
  • The left left-turn lane will be closed during the day Greenfield Ave WB at the I-894/US 45 NB ramps for ATC utility work.
  • The left left-turn lane will be closed during the day I-894/US 45 NB exit ramp to Greenfield Ave for ATC utility work.

Sunday (8/24)

  • The left left-turn lane will be closed during the day Greenfield Ave EB at the I-894/US 45 NB ramps for ATC utility work.
  • The left left-turn lane will be closed during the day Greenfield Ave WB at the I-894/US 45 NB ramps for ATC utility work.
  • The left left-turn lane will be closed during the day I-894/US 45 NB exit ramp to Greenfield Ave for ATC utility work.

Long-Term Closures

  • A lane will be closed Kearney St EB from 76th St to 72nd St through late August 2014 for wall construction.
  • There will be a full closure 101st St NB/SB from Montana Ave to Dakota St through early September 2014 for project construction.
  • A lane will be closed Kearney St EB from I-94 entrance ramp to 76th St 8/14 through 9/5 for box culvert construction.
  • There will be a full closure Watertown Plank Rd WB entrance ramp to US 45 NB through early October 2014 for interchange construction.
  • There will be a full closure US 45 NB exit ramp to Watertown Plank Rd EB through early October 2014 for interchange construction.
  • A lane will be closed Greenfield Ave EB/WB east of Moorland Rd through mid-October 2014 for Walmart construction.
  • There will be a full closure 89th St NB/SB from Watertown Plank Rd to south end of parking structure through Fall 2014 for pedestrian bridge work. Delivery and Emergency Access will remain available.
  • Traffic will be shifted to the SB roadway Discovery Pkwy NB/SB north of Watertown Plank Rd through Fall 2014 for storm sewer work.
  • A lane will be closed Adler St EB/WB from 84th St to 98th St through Fall 2014 for utility work.
  • There will be a full closure 76th St NB/SB over I-94 through Fall 2014 for project construction.
  • A lane will be closed Watertown Plank Rd EB/WB from 87th St to Discovery Pkwy through Fall 2014 for roadway construction.
  • There will be a full closure Watertown Plank Rd EB/WB from Swan Blvd to Discovery Pkwy through Fall 2014 for roadway construction.
  • There will be a full closure Watertown Plank Rd EB entrance ramp to US 45 NB through Fall 2014 for interchange construction.
  • There will be a full closure US 45 NB exit ramp to Watertown Plank Rd WB through Fall 2014 for interchange construction.
  • There will be a full closure Watertown Plank Rd entrance ramp to US 45 SB through Fall 2014 for interchange construction.
  • There will be a full closure US 45 SB exit ramp left turn lane to Watertown Plank Rd EB through Fall 2014 for interchange construction.
  • There will be a full closure HWY 100 entrance ramp to I-94 WB through Fall 2014 for project construction.
  • The 97th St cul-de-sac between Wisconsin Ave and Bluemound Rd will be reduced to one lane (local access maintained) through Fall 2014 for utility work.
  • The 94th St/95th St alley between Wisconsin Ave and Bluemound Rd will be fully closed (local access maintained) through Fall 2014 for utility work.
  • A lane will be closed HWY 100 NB/SB over I-94 through late 2014 for project work.
  • There will be a full closure I-94 WB exit ramp to HWY 100 NB through late 2014 for project construction.
  • There will be a full closure I-94 WB exit ramp to HWY 100 SB through late 2014 for project construction.
  • There will be a full closure HWY 100 entrance ramp to I-94 EB through late 2014 for project construction.
  • There will be a full closure I-94 EB exit ramp to HWY 100 through late 2014 for project construction.
  • The left-most left turn lane Bluemound Rd WB to HWY 100 SB will be closed through late 2014 for project construction.
  • There will be a full closure Schlinger Ave EB/WB under I-894/US 45 through 2017 for project construction.
  • Hank Aaron State Trail will be closed to pedestrians from 94th Pl to Oak Leaf Trail through late 2017 for project construction.

* Note that these closures are weather dependent and subject to change.